Location shortlist / 40 sites

Construction & plans

Announced facilities, construction projects and unresolved delivery status. This view includes 40 sourced records. Delivered and planned MW sit in separate columns, each tied to its source.

Locate sites on the map · Read the capacity definitions

Applied Digital Delta Forge 1Applied DigitalBoyceUnited StatesInfrastructure developerUnder construction—3001Contracted critical IT load; hyperscaler unnamed.—2026-11-11
Applied Digital Polaris Forge 2Applied DigitalHarwoodUnited StatesInfrastructure developerUnder construction—2001Contracted critical IT load; hyperscaler unnamed.—2026-11-11
CoreWeave ArasurCoreWeaveArasurSpainGPU / AI deploymentAnnounced—181Reported future lease allocation, not confirmed operating MW.—2026-11-11
CoreWeave at Bulk N01CoreWeaveVenneslaNorwayGPU / AI deploymentAnnounced———NVIDIA GB200 NVL722026-11-11
CoreWeave DouglasvilleCoreWeaveDouglasvilleUnited StatesGPU / AI deploymentAnnounced—91Announced allocation at each facility in the 2023 agreement.—2026-11-11
CoreWeave FalunCoreWeaveFalunSwedenGPU / AI deploymentAnnounced———NVIDIA Blackwell (announced cluster)2026-11-11
CoreWeave HillsboroCoreWeaveHillsboroUnited StatesGPU / AI deploymentAnnounced—91Announced allocation at each facility in the 2023 agreement.—2026-11-11
CoreWeave Kenilworth NEST 11CoreWeaveKenilworthUnited StatesGPU / AI deploymentUnder construction————2026-11-11
CoreWeave LancasterCoreWeaveLancasterUnited StatesGPU / AI deploymentAnnounced—1001Initial facility plan; potential expansion to 300 MW—2026-11-11
CoreWeave PlanoCoreWeavePlanoUnited StatesGPU / AI deploymentAnnounced————2026-11-11
CoreWeave Stockholm second campusCoreWeaveStockholmSwedenGPU / AI deploymentAnnounced————2026-11-11
Crusoe Abilene MicrosoftCrusoeAbileneUnited StatesGPU / AI deploymentUnder construction—9001New dedicated campus with on-site power; not operating IT load.—2026-11-11
Firmus / SMC Media HubFirmus / SMCSingaporeSingaporeGPU / AI deploymentStatus unconfirmed—31Media Hub GPU AI factory design capacity.—2026-11-11
Firmus Wesley ValeFirmus / SMCWesley ValeAustraliaGPU / AI deploymentStatus unconfirmed————2026-11-11
Fluidstack Barber LakeFluidstackColorado CityUnited StatesGPU / AI deploymentUnder construction—1681Contracted critical IT load; delivery targeted September 2026 in the filing.—2026-11-11
G42 Abu Dhabi StargateG42Abu DhabiUnited Arab EmiratesGPU / AI deploymentUnder construction—1,0001Stargate UAE cluster under construction; distinct from the wider 5 GW technology campus.—2026-11-11
IREN Canal FlatsIRENCanal FlatsCanadaAI use unconfirmedStatus unconfirmed—301Existing campus power; GPU-specific portion undisclosed.—2026-11-11
IREN SweetwaterIRENSweetwaterUnited StatesGPU / AI deploymentUnder construction—2,0001Campus power under construction, not GPU IT load.—2026-11-11
Lambda Chicago AI factoryLambdaChicagoUnited StatesGPU / AI deploymentUnder construction—231Planned single-tenant data center capacity; IT/gross split unspecified—2026-11-11
Lambda Kansas City AI factoryLambdaKansas CityUnited StatesGPU / AI deploymentStatus unconfirmed—241Announced launch capacity; not verified operating capacityNVIDIA Blackwell Ultra2026-11-11
Lambda Plano DFW-04LambdaPlanoUnited StatesGPU / AI deploymentUnder construction————2026-11-11
Nebius IndependenceNebiusIndependenceUnited StatesGPU / AI deploymentUnder construction—1,2001Up to 1.2 GW total campus ambition; not live power—2026-11-11
Nebius LappeenrantaNebiusLappeenrantaFinlandGPU / AI deploymentUnder construction—3101Up to 310 MW at full deployment; IT/gross not stated—2026-11-11
Nebius LondonNebiusLondonUnited KingdomGPU / AI deploymentAnnounced———NVIDIA Blackwell Ultra (contracted deployment)2026-11-11
Nebius near LilleNebiusLilleFranceGPU / AI deploymentUnder construction—2401240 MW when fully deployed; IT/gross not stated—2026-11-11
Nscale BlönduósNscaleBlönduósIcelandGPU / AI deploymentStatus unconfirmed————2026-11-11
Nscale Cobalt Park Stargate UKNscaleCobalt ParkUnited KingdomGPU / AI deploymentAnnounced————2026-11-11
Nscale HayesNscaleHayesUnited KingdomGPU / AI deploymentStatus unconfirmed————2026-11-11
Nscale LoughtonNscaleLoughtonUnited KingdomGPU / AI deploymentStatus unconfirmed—901Maximum scalable power allocation; not delivered IT load.—2026-11-11
Nscale MadisonNscaleMadisonUnited StatesGPU / AI deploymentAnnounced—401Capacity expected online in 2026; 99 MW secured power is a separate scope.—2026-11-11
Nscale MonarchNscale—United StatesGPU / AI deploymentAnnounced—1,3501Phase 1 engineered AI capacity; target early 2028.—2026-11-11
Nscale Narvik / KvandalNscaleNarvikNorwayGPU / AI deploymentUnder construction—2301Planned campus capacity; not verified live IT powerNVIDIA Rubin (planned)2026-11-11
Nscale OsloNscaleOsloNorwayGPU / AI deploymentStatus unconfirmed————2026-11-11
Nscale StavangerNscaleStavangerNorwayGPU / AI deploymentStatus unconfirmed————2026-11-11
Sesterce BosquelSesterceBosquelFranceGPU / AI deploymentAnnounced—1,0001Planned campus or first-phase capacity; no commissioning confirmation.—2026-11-11
Sesterce JämsäSesterceJämsäFinlandGPU / AI deploymentAnnounced—2001Planned campus or first-phase capacity; no commissioning confirmation.—2026-11-11
Sesterce ValenceSesterceValenceFranceGPU / AI deploymentAnnounced—401Planned campus or first-phase capacity; no commissioning confirmation.—2026-11-11
Together AI Memphis 5CTogether AIMemphisUnited StatesGPU / AI deploymentAnnounced———NVIDIA GB200 and GB300 (planned)2026-11-11
Vultr SpringfieldVultrSpringfieldUnited StatesGPU / AI deploymentAnnounced—501Announced additional supercluster deployment; no commissioning confirmation in this release.AMD Instinct MI355X2026-11-11
Yotta D2 BlackwellYottaGreater NoidaIndiaGPU / AI deploymentAnnounced—601D2 data center capacity; campus expansion is separate.NVIDIA Blackwell Ultra (planned)2026-11-11

Other shortlists

  • North America — US and Canadian deployments, from dedicated GPU halls to new campus plans.
  • Europe — Compare Nordic, British and continental European physical deployments.