CoreWeave / Norway
CoreWeave at Bulk N01
A CoreWeave GB200 deployment announced for Bulk’s N01 campus near Kristiansand. The campus owner’s power capacity is not assigned to CoreWeave.
Summer 2025 was a target opening. This source does not confirm commissioning. Bulk’s 400 MW secured campus power is not CoreWeave-specific.
Site evidence
Source per value- Operator GPU-cloud provider tied to this physical site.
- CoreWeave 1
- City / locality Source-named city, metro or locality. Null when only a county, state or dedicated regional facility is disclosed; no guessed city.
- Vennesla 1
- Country Country of the physical deployment.
- Norway 1
- Evidence status Status supported by the cited evidence. An operational site may also have future expansion; target dates alone do not prove opening.
- Announced 1
- Facility / partner Named host, owner or development partner; role shown where stated.
- Bulk Infrastructure 1
- Disclosed power MW Read together with Power basis. This may be an IT lease, campus plan, facility capacity or a delivered phase; values must not be summed.
- Not published
- Power basis Scope, timing and qualification of the disclosed MW. Operational status does not imply all listed MW are live.
- Not published
- GPU platform Site-specific deployed or announced platform. Expansion and future deployment are explicitly marked.
- NVIDIA GB200 NVL72 1
- Disclosed GPUs Published count, approximation or lower bound. Read GPU count basis for deployed versus planned scope.
- Not published
- GPU count basis Exact scope of the GPU count, including lower bounds and target years. Counts are not a current availability inventory.
- Not published
- Interconnect Site-specific networking named in the source; no inference from a provider-wide offer.
- NVIDIA Quantum-2 InfiniBand 1
- Cooling Cooling design or installed method at the site; expansion scope retained where relevant.
- Not published
- Evidence date Date of the cited status statement or reporting period. Null means an undated page; accessed dates remain in sources.
- 2025-03-14 1
- Scope notes Research reconciliation, historical qualifications and unresolved delivery questions, with sources.
- Summer 2025 was a target opening. This source does not confirm commissioning. Bulk’s 400 MW secured campus power is not CoreWeave-specific. 1
- Locality latitude ° Open-Meteo / GeoNames locality centroid, rounded to four decimals. Not a facility coordinate.
- 58.269 2
- Locality longitude ° Open-Meteo / GeoNames locality centroid, rounded to four decimals. Not a facility coordinate.
- 7.973 2
- State / region Source-disclosed state, province or county when the city is withheld.
- Not published
- Delivered MW MW Explicitly operating or delivered power, at the evidence date. Power basis defines IT, facility or phase scope. Null if not verified.
- Not published
- Planned / contracted MW MW Announced expansion or total contracted power; may include delivered phases. Read the power basis and notes; never sum with delivered MW.
- Not published
- Site scope Editorial classification from the cited operator/site evidence. General cloud presence does not assert site-level GPU inventory; historical projects are not active deployments.
- GPU / AI deployment 1
Sources & access dates
- Bulk and CoreWeave N01 deployment, March 2025 accessed 2026-11-11
- Open-Meteo / GeoNames: Vennesla locality coordinates accessed 2026-11-11
Continue the shortlist
Europe →Construction & plans →Norway →CoreWeave →All mapped locations →
Discuss capacity at CoreWeave at Bulk N01
Send your GPU requirements, preferred location, timeline and budget. Name the operators you want to contact.
Email a capacity requestRequests are handled by email at hello@neocloudmap.com.