Vultr / United States
Vultr Springfield
Vultr’s 50 MW AMD supercluster at 5C’s Springfield, Ohio campus: more than 24,000 Instinct MI355X GPUs.
Ohio AI campus is separately identified from Vultr public cloud regions; delivery status remains an announced expansion.
Site evidence
Source per value- Operator GPU-cloud provider tied to this physical site.
- Vultr 1
- City / locality Source-named city, metro or locality. Null when only a county, state or dedicated regional facility is disclosed; no guessed city.
- Springfield 1
- Country Country of the physical deployment.
- United States 1
- Evidence status Status supported by the cited evidence. An operational site may also have future expansion; target dates alone do not prove opening.
- Announced 1
- Facility / partner Named host, owner or development partner; role shown where stated.
- 5C 1
- Disclosed power MW Read together with Power basis. This may be an IT lease, campus plan, facility capacity or a delivered phase; values must not be summed.
- 50 1
- Power basis Scope, timing and qualification of the disclosed MW. Operational status does not imply all listed MW are live.
- Announced additional supercluster deployment; no commissioning confirmation in this release. 1
- GPU platform Site-specific deployed or announced platform. Expansion and future deployment are explicitly marked.
- AMD Instinct MI355X 1
- Disclosed GPUs Published count, approximation or lower bound. Read GPU count basis for deployed versus planned scope.
- 24,000 1
- GPU count basis Exact scope of the GPU count, including lower bounds and target years. Counts are not a current availability inventory.
- More than 24,000 additional GPUs in the announced expansion; not an installed-count measurement. 1
- Interconnect Site-specific networking named in the source; no inference from a provider-wide offer.
- Not published
- Cooling Cooling design or installed method at the site; expansion scope retained where relevant.
- Not published
- Evidence date Date of the cited status statement or reporting period. Null means an undated page; accessed dates remain in sources.
- 2025-12-02 1
- Scope notes Research reconciliation, historical qualifications and unresolved delivery questions, with sources.
- Ohio AI campus is separately identified from Vultr public cloud regions; delivery status remains an announced expansion. 1
- Locality latitude ° Open-Meteo / GeoNames locality centroid, rounded to four decimals. Not a facility coordinate.
- 39.924 2
- Locality longitude ° Open-Meteo / GeoNames locality centroid, rounded to four decimals. Not a facility coordinate.
- -83.809 2
- State / region Source-disclosed state, province or county when the city is withheld.
- Not published
- Delivered MW MW Explicitly operating or delivered power, at the evidence date. Power basis defines IT, facility or phase scope. Null if not verified.
- Not published
- Planned / contracted MW MW Announced expansion or total contracted power; may include delivered phases. Read the power basis and notes; never sum with delivered MW.
- 50 1
- Site scope Editorial classification from the cited operator/site evidence. General cloud presence does not assert site-level GPU inventory; historical projects are not active deployments.
- GPU / AI deployment 1
Sources & access dates
- Vultr Springfield site evidence accessed 2026-11-11
- Open-Meteo / GeoNames: Springfield, Ohio locality center accessed 2026-11-11
Continue the shortlist
North America →Construction & plans →United States →Vultr →All mapped locations →
Discuss capacity at Vultr Springfield
Send your GPU requirements, preferred location, timeline and budget. Name the operators you want to contact.
Email a capacity requestRequests are handled by email at hello@neocloudmap.com.