Nebius / United States
Nebius Vineland
Nebius’s New Jersey AI factory, built by DataOne in Vineland, serves the Microsoft contract and scales to 300 MW.
Nebius serves its Microsoft contract exclusively from its New Jersey data center and reported all capacity tranches delivered in its Q2 2026 letter. Full campus build-out runs to 2027 on on-site Bloom Energy fuel cells.
Site evidence
Source per value- Operator GPU-cloud provider tied to this physical site.
- Nebius 1
- City / locality Source-named city, metro or locality. Null when only a county, state or dedicated regional facility is disclosed; no guessed city.
- Vineland 1
- Country Country of the physical deployment.
- United States 1
- Evidence status Status supported by the cited evidence. An operational site may also have future expansion; target dates alone do not prove opening.
- Operational 4
- Facility / partner Named host, owner or development partner; role shown where stated.
- DataOne; Northeast Precast 1
- Disclosed power MW Read together with Power basis. This may be an IT lease, campus plan, facility capacity or a delivered phase; values must not be summed.
- 300 2
- Power basis Scope, timing and qualification of the disclosed MW. Operational status does not imply all listed MW are live.
- Up to 300 MW phased design capacity (Nebius, March 2025). 2
- GPU platform Site-specific deployed or announced platform. Expansion and future deployment are explicitly marked.
- Not published
- Disclosed GPUs Published count, approximation or lower bound. Read GPU count basis for deployed versus planned scope.
- Not published
- GPU count basis Exact scope of the GPU count, including lower bounds and target years. Counts are not a current availability inventory.
- Not published
- Interconnect Site-specific networking named in the source; no inference from a provider-wide offer.
- Not published
- Cooling Cooling design or installed method at the site; expansion scope retained where relevant.
- Closed-loop cooling 1
- Evidence date Date of the cited status statement or reporting period. Null means an undated page; accessed dates remain in sources.
- 2026-08-12 4
- Scope notes Research reconciliation, historical qualifications and unresolved delivery questions, with sources.
- Nebius serves its Microsoft contract exclusively from its New Jersey data center and reported all capacity tranches delivered in its Q2 2026 letter. Full campus build-out runs to 2027 on on-site Bloom Energy fuel cells. 4
- Locality latitude ° Open-Meteo / GeoNames locality centroid, rounded to four decimals. Not a facility coordinate.
- 39.486 3
- Locality longitude ° Open-Meteo / GeoNames locality centroid, rounded to four decimals. Not a facility coordinate.
- -75.026 3
- State / region Source-disclosed state, province or county when the city is withheld.
- New Jersey 1
- Delivered MW MW Explicitly operating or delivered power, at the evidence date. Power basis defines IT, facility or phase scope. Null if not verified.
- Not published
- Planned / contracted MW MW Announced expansion or total contracted power; may include delivered phases. Read the power basis and notes; never sum with delivered MW.
- 300 2
- Site scope Editorial classification from the cited operator/site evidence. General cloud presence does not assert site-level GPU inventory; historical projects are not active deployments.
- GPU / AI deployment 1
Sources & access dates
- Nebius Vineland community project documentation accessed 2026-11-11
- Nebius New Jersey design capacity, March 2025 accessed 2026-11-11
- Open-Meteo / GeoNames: Vineland locality coordinates accessed 2026-11-11
- Nebius Q2 2026 shareholder letter, 12 Aug 2026 accessed 2026-11-11
Continue the shortlist
North America →Operating deployments →United States →Nebius →All mapped locations →
Discuss capacity at Nebius Vineland
Send your GPU requirements, preferred location, timeline and budget. Name the operators you want to contact.
Email a capacity requestRequests are handled by email at hello@neocloudmap.com.